Elevated Support, Steel Base

16-BS-7, 16-BS-12

16-AH-SS
Part Number Material Max.
Uniform Load
Wt./Each
16-BS-7 HDG Hot-Dipped
Galvanized
150 lbs. 7.5 lbs.
16-BS-7 SS Stainless Steel 150 lbs. 7.5 lbs.

16-BS-7, 16-BS-12

12-Base-Strut-SS

Part Number Material Max.
Uniform Load
Wt./Each
12-BS-7 HDG Hot-Dipped
Galvanized
150 lbs. 7.5 lbs.
12-BS-7 SS Stainless
Steel
150 lbs. 7.5 lbs.

Determining Maximum Pipe Size

Maximum pipe size supported by any of the strut supports is determined by the load and the clear space required between the pipes. The spacing between pipes should be as follows:

  • 1" between piping 3" and smaller.
  • 1-1/2" between a pipe 3" and smaller and a pipe 4" or larger.
  • 2" between piping 4" and larger.
  • At least 1" between pipe clamp and end of strut

For example, a support for two 3" pipes would require:
1" + 3" + 1-1/2" + 3" + 1" = 9-1/2" wide channel support